精品国产91台湾_日韩精品无码性爱福利_亚洲中文无码不卡在线观看_中文字幕色婷婷久五月_欧美精品狂野欧美成人_又色又爽又黄的视频app无遮挡_一级做a毛免费视频_亚洲欧美成人一区二区在线_99热青青草超碰在线_波多野潮喷无码番号

News
Contact Us
Suzhou Zuosheng  Machinery Technology Co., Ltd.
ADD: 83th Hexi Road, Wangting Town, Xiangcheng District, Suzhou City, China
MOB: 13814812955
Email: sales@chinazuosheng.com
             784224938@qq.com 
             szzsjx@tom.com
Website: 177taobao.cn
 

Company News

Home  >  News  >  Company News
    Steps for Safe Use of Lifts

    To ensure the safe use of lifts combined with relevant rules and regulations formulated lift safety rules.
    1, Using the lift must be configured through specialized training, examination, certificates of professional operators.
    2, Lift operators must follow the maintenance requirements of machinery and equipment, after the implementation of the inspection and maintenance before they start lifting platform, the scope of work should be checked before the lifts work, turning and walking Clear hinder lift obstacles.
    3, Check all the wires, cables or without injury, should be promptly dressing and replacement part has been damaged.
    4, Support is an important preparatory work. You should choose the flat ground, such as soft or rough ground, the pad must be real sleepers before work.
    5, The general should be played under the lift arm, renewed in the arm, and finally from the upper arm. In the process of turning the lift operation must be carried out from the lower arm swing up to a certain height, the rotation should be slow, taking care to cut the distance between the arm and the platform for the device meets the safety requirements.
    6, Before the lift operation, the operator responsible person shall conduct technical and security account, which shall include: job content and requirements; safety precautions and dangerous point; personnel division of labor and responsibility.
    Responsible person other than you want to check the condition and operating personnel, but also for view terrain, landing meets the safety requirements of technical measures or programs of work developed in advance, if different, should develop appropriate measures can only work.

     

    Related articles
Suzhou Zuosheng Machinery Technology Co., Ltd
ADD: 83th Hexi Road, Wangting Town, Xiangcheng District, Suzhou City, China
MOB: 13814812955
 
Copyright © 2013 Suzhou Zuosheng Machinery Technology Co., Ltd      SUICP:2023006837  MOB:13814812955
Design by chinanova.com Support by Cityzone.cn
Close

  • 蘇州佐升機(jī)械
    13814812955